IBIS Macromodel Task Group Meeting date: 11 May 2010 Members (asterisk for those attending): Adge Hawes, IBM Ambrish Varma, Cadence Design Systems Anders Ekholm, Ericsson * Arpad Muranyi, Mentor Graphics Corp. Barry Katz, SiSoft Bob Ross, Teraspeed Consulting Group Brad Brim, Sigrity Brad Griffin, Cadence Design Systems Chris Herrick, Ansoft Chris McGrath, Synopsys Danil Kirsanov, Ansoft David Banas, Xilinx Deepak Ramaswany, Ansoft Donald Telian, consultant Doug White, Cisco Systems Eckhard Lenski, Nokia-Siemens Networks Eckhard Miersch, Sigrity Essaid Bensoudane, ST Microelectronics Fangyi Rao, Agilent Ganesh Narayanaswamy, ST Micro Gang Kang, Sigrity Hemant Shah, Cadence Design Systems Ian Dodd, consultant Jerry Chuang, Xilinx Joe Abler, IBM * John Angulo, Mentor Graphics John Shields, Mentor Graphics * Ken Willis, Sigrity Kellee Crisafulli, Celsionix Kumar Keshavan, Sigrity Lance Wang, Cadence Design Systems Luis Boluna, Cisco Systems Michael Mirmak, Intel Corp. * Mike LaBonte, Cisco Systems Mike Steinberger, SiSoft Mustansir Fanaswalla, Xilinx Patrick O'Halloran, Tiburon Design Automation Paul Fernando, NCSU Pavani Jella, TI Radek Biernacki, Agilent (EESof) * Randy Wolff, Micron Technology Ray Komow, Cadence Design Systems Richard Mellitz, Intel Richard Ward, Texas Instruments Samuel Mertens, Ansoft Sam Chitwood, Sigrity Sanjeev Gupta, Agilent Scott McMorrow, Teraspeed Consulting Group Shangli Wu, Cadence Design Systems Sid Singh, Extreme Networks Stephen Scearce, Cisco Systems Steve Kaufer, Mentor Graphics Steve Pytel, Ansoft Syed Huq, Cisco Systems Syed Sadeghi, ST Micro Ted Mido, Synopsys Terry Jernberg, Cadence Design Systems Todd Westerhoff, SiSoft Vladimir Dmitriev-Zdorov, Mentor Graphics Vikas Gupta, Xilinx Vuk Borich, Agilent * Walter Katz, SiSoft Wenyi Jin, LSI Logic Zhen Mu, Mentor Graphics ------------------------------------------------------------------------ Opens: - Arpad: What would be a quorum for our group? - Randy: For the Open Forum it is 5 - Mike: The Quality Task Group uses 3 - We decided we had a quorum - Walter: Would like to discuss IBIS Spice Subcircuits -------------------------- Call for patent disclosure: - No one declared a patent. ------------- Review of ARs: - Arpad: Write parameter passing syntax proposal (BIRD draft) for *-AMS models in IBIS that is consistent with the parameter passing syntax of the AMI models - TBD - TBD: Propose a parameter passing syntax for the SPICE - [External ...] also? - TBD - Arpad: Review the documentation (annotation) in the macro libraries. - Deferred until a demand arises or we have nothing else to do ------------- New Discussion: IBIS Spice Subcircuits: - Walter: Can we consider the ISS BIRD ready for submission? - Arpad: There were some unanswered questions - Bob felt we should clarify those before the Open Forum gets it - Walter: We need to get past this - Maybe a discussion in Open Forum would be good - Mike: Years ago we had lengthy technical discussions in Open Forum meetings - Currently there is little technical discussion there - Many of the same people are in both meetings - Arpad: There was a push at one point to avoid technical details - Walter: The DAC summit is coming up - Arpad: There are still ambiguities in this BIRD - Walter: Does anyone have a list of the ambiguities? - Mike: I could compile related sections from the minutes - Walter: It would be best to start at the end - Mike: Should it go to the list or just the attendees? - Arpad: The list is OK - Randy: At the end we were waiting for feedback from companies - Arpad: The latest ISS spec version is Aug 11, 2009 AR: Mike compile comments on ISS from minutes Arpad: I was expecting more feedback on the flow diagram - There was debate about the spreadsheet vs. equation box formats - Mike: Can we have both? - People have legitimate reasons to prefer one over the other - Arpad: My goal is not to follow flow diagram symbols - One suggestion was to have equations along the flow lines - Mike: Ambrish liked a previous flow style version - Arpad: With changes - It can be a lot of work to maintain two versions - There are a lot of booleans, making for many possibilities - Walter: It would be best to document two categories: - Statistical with Init_Returns_Filter - Time domain where TX and RX GetWave exist - Mike: Does this cover all cases? - Walter: Everything else can be figured out - It's too complicated to document everything - Arpad: We can't leave anything undocumented - Walter: Or we can go back to what we had in November - As though Init_Returns_Filter does not exist - We could revote on it - Arpad: It's important that Use_Init_Output has been clarified - Walter: Use_Init_Output was a bad thing to have - It should always be False - Arpad: Also the addition of Init_Returns_Impulse is good - Arpad: There were no technical comments from last week - Mike: Should it be settled by a smaller group? - Arpad: We don't want to have a wrestling match there - Ken: Equations will be added to the flow from last week? - Arpad: Yes Next meeting: 18 May 2010 12:00pm PT -------- IBIS Interconnect SPICE Wish List: 1) Simulator directives